Online

WhatsApp

Message

Top

Steel plant coal preparation mill production line

Steel plant coal preparation system project main coal preparation grinding mill equipments are the latest development of KEFID vertical grinding mills, they can combination the desulfurization, denitrification, dust removal device integrally mounted so pulverized coal boiler increased combustion efficiency, improve production capacity, while reducing pollutant emissions.

Coal production mill equipments: more than 10 sets ultra fine vertical grinding mill or VM series vertical grinding mill, machine rated power 600KW

Processing material: bituminous coal, 200 mesh = D80

Ultra fine vertical grinding mill

Input size: 38-55 mm

Final product size: 400-1250mesh

Capacity: 5-18t / h

LM series coal mill

Feed size: 38-65 mm

Capacity: 10-290T/h

PE jaw crusher

Feed size: 125-1200mm

Capacity: 5-1100T/h

KEFID large-scale grinding equipment vertical grinding mill is of stable operation, high yield, the small wearing wear parts and easy to replace, the device combines crushing, drying, grinding, grading, conveying in one, vertical grinding mill is coal preparation, power plant desulfurization, cement, slag mill ideal mill equipment.

Top